Macro Etch Lab

Description of Project:

Design a new Macro Etch Lab located at the 3SP.  The new building will contain conveyors, a milling machine, turning device, macro etch machine, chilling station, grinder, band saw and inspection station.

Scope of Work:

HOH designed the new 36’ x 100’ lab including the building, foundation, mechanical and electrical systems.  HOH also acted as the on site PM and CM.  As on site PM HOH located new/refurbished equipment for installation into the new Macro Etch Lab and oversaw the refurbishment/upgrade of several pieces of equipment.  As the CM HOH oversaw the installation contractors in their day to day activities and was responsible for the safe implementation of the work.

Value to Client:

The new Macro Etch Lab will now be located at the 3SP where it needed, eliminating the need to transport the slab from the existing lab at 2SP.  This is essential with the increase of products requiring etch testing.

 

Location:

Indiana Harbor, IN

Related Projects

View All

Pickling / Tandem Mill And Continuous Pickling Line

Structural engineering design for an all new cold-rolling facility located in Calvert, Alabama.

Read More

ATI Steel Hot Rolling Processing Facility

HOH provided the structural engineering design for the new Hot Rolling Processing Facility being built in Breckenridge, PA.

Read More

NIPSCO Bailly And RMS WWTP

New 18,000 gpd Sewage Treatment Facility for CLIENT’S Generating Station in Indiana.

Read More