Arcelormittal Mold Conversion Structural

Description of Project:

Arcelor Mittal is in the process of converting the molds on the continuous caster CCM #1 located at the 3SP.  Once complete the caster will be able to cast 9 1/4” thick slabs versus the 10” thick slabs it presently casts.

Scope of Work:

HOH inspected the structural steel and cladding of CCM #1 both outside and inside the spray chamber.  Structural steel and cladding that needed to be replaced was documents and designed so the it could be replaced in sections in 14 hours mini outages.  Existing cladding was replaced with stainless steel cladding.

Value to Client:

The modified caster will produce a slab that has more applications than the present 10” think slab and open additional markets for sale.  HOH by preparing the design and details to be installed in 14 hour mini outages enables the caster to maximize production and limit down time.

Location:

Indiana Harbor, IN

Related Projects

View All

Pickling / Tandem Mill And Continuous Pickling Line

Structural engineering design for an all new cold-rolling facility located in Calvert, Alabama.

Read More

ATI Steel Hot Rolling Processing Facility

HOH provided the structural engineering design for the new Hot Rolling Processing Facility being built in Breckenridge, PA.

Read More

NIPSCO Bailly And RMS WWTP

New 18,000 gpd Sewage Treatment Facility for CLIENT’S Generating Station in Indiana.

Read More