Description of Project:

Addition of Crane Access Platforms at all existing and new Hot Strip Mill Slab Yard bays. Bays 1 thru 4 required modifications and additions to existing stair towers while crane access platforms were designed directly into the new Bay 5 stair towers.

Scope of Work:

Engineering design scope consisted of the following:

» Concept development including full plan layouts and detailed isometric 3-D models.

» Coordination with crane operators and presentation to the safety team.

» Final design and details for new access platforms including modifications to existing runway.

Value to Client:

Current access to the EOT cranes utilizes a series of ladders and crossovers. Addition of crane access platforms will simplify and significantly reduce the amount of time required to access/egress EOT cranes resulting in substantial reduction in crane down time and therefore an increase in the overall productivity.

Related Projects

View All

Pickling / Tandem Mill And Continuous Pickling Line

Structural engineering design for an all new cold-rolling facility located in Calvert, Alabama.

Read More

ATI Steel Hot Rolling Processing Facility

HOH provided the structural engineering design for the new Hot Rolling Processing Facility being built in Breckenridge, PA.

Read More

NIPSCO Bailly And RMS WWTP

New 18,000 gpd Sewage Treatment Facility for CLIENT’S Generating Station in Indiana.

Read More